Estimate the installed cost of a new industrial heat pump from process temperature, annual thermal load, run hours, heat source, integration requirements, contingency, and incentives.

Process assumptions

Use the same core process inputs as the Industrial Compare tool, then define the project integration.

01 Temperature and load
100°F temperature lift
02 System and integration
Estimated turnkey installed cost
—

Equipment, heat exchangers, integration, controls, engineering, commissioning, and contingency included.

Net cost after incentives—
Required thermal capacity—
Turnkey cost per kWth—

What the turnkey estimate includes

These planning allowances allocate the calculated total. Industrial integration can materially change the installed cost.

Heat pump equipment—
Heat exchangers and process interface—
Mechanical installation—
Electrical work—
Controls and integration—
Engineering and commissioning—
Project contingency—

Screening estimate only. Actual turnkey cost depends on source and sink temperatures, refrigerant selection, process heat exchangers, redundancy, electrical service, structural work, controls, shutdown sequencing, permitting, and vendor guarantees. Required thermal capacity is the annual load converted to kWh thermal and divided by entered operating hours.